Chandrayaan-1

Launch: October 22, 2008             Site: Satish Dhavan Space Centre, Sriharikota

The objectives of the programme were:

  1. To develop and orbit a spacecraft around moon using an Indian-made launch vehicle.
  2. To prepare a three-dimensional atlas of both the near and the far side of the moon.
  3. Chemical and mineralogical mapping of the entire lunar surface.
  4. To study the impact of Moon Impact Probe on the surface of the moon as a fore-runner to future soft landing missions.

NASA’s Moon Mineralogy Mapper (M3) had on Chandrayaan-1 had detected water on the surface of moon. The mission was expected to last two years. However, the communication with the satellite was lost on 29 August 2009 and the mission was declared over. It lasted for 312 days and achieved 95 percent of its objectives.

Chandrayaan-1 was selected by the American Institute of Aeronautics and Astronautics (AIAA) as one of the recipients of its annual AIAA SPACE 2009 awards for contributions to space science and technology.

Read moreChandrayaan-1

GPS Aided Geo Augmentation Navigation (GAGAN)

It is a planned implementation of Satellite Based Navigation System (SBNS) developed by Airports Authority of India (AAI) and ISRO. GAGAN is expected to provide a civil aeronautical navigation signal consistent with International Civil Aviation Organization (ICAO) Standards and Recommended Practices as established by the Global Navigation Satellite System Panel. GAGAN was launched in August … Read more GPS Aided Geo Augmentation Navigation (GAGAN)

30.01.18 Mizoram(MizoramPSC) Current Affairs

NORTH-EASTERN STATES Territorial integrity of North eastern states won’t be compromised: Rajnath   Territorial integrity of Assam and other northeastern states will not be compromised when the final Naga peace accord is inked, home minister Rajnath Singh assured Assam chief minister Sarbananda Sonowal.   The insurgent group NSCN-IM’s key demand is to integrate the Naga-inhabited areas of Arunachal Pradesh, … Read more 30.01.18 Mizoram(MizoramPSC) Current Affairs

Health, Education, Human Resources.

Issues relating to development and management of Social Sector/Services relating to Health, Education, Human Resources. Health link are https://docs.google.com/file/d/0B_FR6Jkv0z2ceFBXTnpyaXdFYkk/edit?usp=sharing it states dat rural health but articles cover urban health too   Education link is https://docs.google.com/file/d/0B_FR6Jkv0z2cbENTY0xpNVdzaVU/edit?usp=sharing

Internet Protocol version 6

Internet Protocol version 6 (IPv6) is a version of the Internet Protocol (IP). It is designed to succeed the Internet Protocol version 4 (IPv4). While IPv4 allows 32 bits for an Internet Protocol address, and can therefore support 232 (4,294,967,296) addresses, IPv6 uses 128-bit addresses, so the new address space supports 2128 (approximately 340 undecillion or 3.4×1038) addresses. This expansion allows for many more devices and users on the internet as well as extra flexibility in allocating addresses and efficiency for routing traffic. It also eliminates the primary need for network address translation (NAT), which gained widespread deployment as an effort to alleviate IPv4 address exhaustion.
IPv6 also implements additional features not present in IPv4. It simplifies aspects of address assignment (stateless address autoconfiguration), network renumbering and router announcements when changing Internet connectivity providers.
The Internet Protocol Suite is the set of communications protocols used for the Internet and other similar networks.
The Internet Protocol (IP) is the principal communications protocol used for relaying datagrams (packets) across an internetwork using theInternet Protocol Suite. Responsible for routing packets across network boundaries, it is the primary protocol that establishes the Internet.

Read moreInternet Protocol version 6